Drywall baby....just get'r done....PLEASEEeeeee!!!



I am going to try and get this blog back on track and also get the house construction up to date.....a lot has been going on the past three weeks as we are racing to the finish.....I can actually see it now. The drywallers have finished the second floor....with 3 coats...


It's now time to go back and look for those little nicks and bumps that the drywallers never quite get done.....


After the three coats of mud was sanded to a slick finish, they ran a sweeper over the walls, ceiling and then the floor before the primer went on.


The theater room is ready for primer after the roof was cleaned.....the open area will be for 4-32" flat screens and a 65" flat screen to watch 5 channels of football ....and SOON!!!!!.....ROTFL


After priming the walls and ceiling they started to cut in the ceiling with a color that the feng shui guru picked out.....so I am in harmony with.....I guess sound waves..


The Jack Daniels pool room is also ready for painting, the beam logs where covered and taped just in case someone is messy.....


I asked the guys to finish the exercise area with an old fashion plaster look.....well these guys are in their 20's and they never used anything but a spray gun and did knock down. So they took several pieces of scrape and worked it until they found a style I could learn to love.......


With 12 foot ceiling in the house, the amount of plaster on the floor is measured in 5 gallon buckets to the dumpster. Twenty buckets on the wall.....one to the dumpster.


The drywaller are ready to finish the exercise area......the boxes above the windows are for flat screens...a total of 3 so you can watch Maria, F-troops and the Adams Family at the same time....just going to be hard to tell which is which.....