Wine and Rock........


The wine room is coming together nicely, it was shipped in about 40 boxes and you can see the side rails. The corner pieces had to be built onsite.

The door jams are being installed in this 1474 bottle wine room.....humidity control along with a temperature control system will keep our champipple...just right...hehe

The inlay tile is from a vineyard in Spain that we had lunch at about two years ago and trimmed in oak bark.

27" flat screens are being installed up in the theater room.....a total of 4 with 2 on each side of a 52" Sony flat screen will make this a TV you can watch 5 games on at the same time without flipping around....

After covering the porch roof, they are ready to lay the final stone work on the house itself.

Working off scaffolding is just part of this business, using some high tech thingie you would buy at home depot is out for these guys.....a pulley and a rope is all they needed......:)

Now if you wanted to eat some great home Mexican cookin...well this lady can grill you some interesting lookin stuff...but MAN, it's great. She works until about 11:30 then goes and cooks for the guys.....just the stone workers.....and then goes back to stacking stone.......all day.

We wrapped the 42" front door before they started and the word of the day was ....DON'T leave a mark on this door.

We have to have all these crazy tools to do our work....but they just need a saw.

They look for the right stone....then trim it up....and slap it in place....DJ is thinking about how to finish out trim while taking a short break......

It was great to see them use a square instead of just eyeballing it.......

as they finish out the columns on the porch.......

No comments: