Monday, December 19, 2005
The road at times is backed all the way to the top of the drive with equipment or differnet folks there to work. Cortese showed up to treat the 82 hemlock trees we have on the property with a stick drilled into the base of each tree. This diseas is called the Wooly Adelgid and is really creating a problem at the National Park next door.....
The pipe fitter are driving me nuts, I asked them to run 3 sets of pipes to the second level deck so the fire glow stands would work...SURE, NO PROBLEM...except they ran the pipe out on the third level decks.....right church...wrong pew!!!
But they have finished up and we passed all the tests so far...
At times, it feels like all we do in is install windows....level them....brace them....nail them.....
Once they are set in place....both side are covered with plastic to keep the rain off them and also in case of any spraying that might be done......Jason used to work for the city....can't ya tell....
Roof supports are now going into place....over windows and doors...
I really have a problem with nail and screw holes....even if they are plugged, you can always tell......so everything is attached from the inside out. Scrap LVL's were saved and have been nailed between the studs and then the roof support are lagged from the inside out.
The rafters and support are ready to be trimmed out and sheeted.....