![](http://photos1.blogger.com/hello/122/4356/400/fire174.jpg)
They started stone casing the house on the west side, each stone had to be carried from down on the drive or from the top along with their mortar mix.
![](http://photos1.blogger.com/hello/122/4356/400/fire175.jpg)
Everyday around 9:00am they showed up with a load of materials in their trailer. It only took them about 4 days to get over the hump on the west side.
![](http://photos1.blogger.com/hello/122/4356/400/fire176.jpg)
With in 6 days, working up to about 7:30-8:00pm they had completed the west side and moved over to the other side and started right in.
![](http://photos1.blogger.com/hello/122/4356/400/fire178.jpg)
Again working 12-14 hours days, they continue to climb the 35 foot walls...higher and higher.
![](http://photos1.blogger.com/hello/122/4356/400/fire179.jpg)
About half the stones needed cut or trimmed as they are placed, a man, this wife and two brothers are the best rockers I have ever seen on a daily basis.
![](http://photos1.blogger.com/hello/122/4356/400/fire177.jpg)
The garage doors are 10 feet high by 9 feet wide, even my mother in law can get thru this puppies. Over the arches we will have one row of red brick to break it up a little....but they have been working on the front and the back of the house at the same time......hoping to be done by Thanksgiving so they can move inside.